A realistic timeline for kitchen remodels in the Raleigh area — from first call to finished project.
One of the most common questions we hear: How long will this take? The answer depends on the work involved. Here’s a ballpark, plus the pre-construction time most homeowners forget to count.
Cabinet refacing, new countertops, or a backsplash refresh can often wrap in one to two weeks. Demo is minimal, and materials are usually in stock or have short lead times.
Replacing cabinets, moving plumbing or electrical, or adding an island typically runs four to six weeks. Cabinet lead times (often 2–4 weeks) and countertop templating add to the schedule.
A complete kitchen overhaul — new layout, structural changes, new everything — usually takes two to three months. We build in time for permits, inspections, and material deliveries.
The construction clock isn’t the whole project. Before anyone swings a hammer:
A project that “starts fast” with materials arriving mid-job almost always ends slower than one that starts after everything is in hand.
For a mid-size remodel, the construction phase usually follows this order: demo, any plumbing/electrical rough-in, drywall and repair, cabinet installation, countertop template then install, backsplash, fixture and appliance connections, paint touch-ups, and punch list. Countertop templating is the step that surprises people — it can’t happen until cabinets are set, and fabrication adds its own window.
We give you a clear timeline in your written quote and keep you updated as we go.